Nearly 8 years ago the Pennsylvania Fish and Boat Commission began the draw-down of the nearby Meadow Grounds Lake. After much behind the scenes work, construction finally began in early May of this year and is finally drawing to a close. I captured these images during a visit December 28 when the construction crew appeared to be nearing the end.
Refilling is slated to begin this winter continuing into the spring.
Dam Face |
The new auxiliary spillway facing the lake
Auxiliary spillway facing upstream
Wide downstream view of dam
1 comment:
I’m assuming that this is all good news. Will it be stocked with fish?
Post a Comment